The P4 parking facility at YUL Montréal-Trudeau International Airport is the first airport project in Canada to achieve Envision Verification. Designed to provide safe short- and long-term parking for terminal users and accommodate demand during peak periods, the project consists of a four-level parking structure with a footprint of approximately 25,000 m2 and capacity for up to 2,860 vehicles.
The project emphasized strong collaboration and sustainability leadership, incorporated forward-looking resource management practices, and was built with long-term adaptability in mind. Through its Envision Verified rating, the project’s diverse and long-term sustainability achievements have been recognized and validated through the independent, thirty-party evaluation process managed by ISI.
“This certification is an important recognition of the work accomplished by our teams and partners. Our ambition has always been to make the P4 parking facility a benchmark project, capable of meeting our users’ needs while reducing its environmental footprint. This distinction demonstrates that it is possible to develop high-performing, sustainable and resilient infrastructure for the benefit of our community.”
— Yves Beauchamp, President and Chief Executive Officer of ADM Aéroports de Montréal
“The P4 parking facility at YUL Montréal-Trudeau International Airport demonstrates how sustainability can be integrated into the planning, design, and delivery of critical airport infrastructure. The project reflects ADM’s commitment to building sustainable infrastructure, ensuring responsible stewardship, and delivering long-term value for the travelling public. Congratulations to ADM and the entire project team on achieving Envision Verification for this important infrastructure project.”
— Anthony Kane, President & CEO of ISI
ADM Aéroports de Montréal, the airport authority for Greater Montréal, is responsible for the management, operation and development of YUL Montréal-Trudeau International Airport and the YMX Tech Park. Built on a previously developed site owned by Transport Canada, the project is part of the first phase of a broader redevelopment of landside infrastructure outlined in ADM’s Master Plan. The new facility helps fulfill parking demand as other YUL projects advance, including the development of passenger drop-off areas, while accommodating continued passenger growth. The design also supports long-term adaptability, including the potential conversion to office use after 20 years.
Completed in 2024, the project was developed collaboratively by ADM and the Lemay–Jodoin Lamarre Pratte consortium. Throughout the design process, nearly one hundred meetings involving ADM representatives, architects, engineers, external experts, and other stakeholders helped optimize the project and ensure it met client and community expectations. Within ADM, departments that interact directly or indirectly with customers — security, customer service, parking operations — were involved in the design process to prioritize opportunities to enhance the traveller experience.

Verified Sustainability Achievements
Providing Effective Leadership – ADM prioritized sustainable development principles and selected the project as a pilot for applying the Envision framework. A sustainability development plan, including monitoring mechanisms, ensured alignment with Envision objectives and stakeholder engagement throughout the project. An Envision tracking matrix served as a common tool to track credit status and progress, identify credits at risk or requiring trade-off decisions, and assign responsibilities by discipline.
Advancing Community Mobility, Public Space & Amenities – The project aligns with local and regional transportation priorities. Increasing infrastructure capacity at YUL Montréal–Trudeau International Airport demonstrates strong synergy with Tourisme Montréal’s strategic objectives and the Metropolitan Land Use and Development Plan. The planning process identified intermodality and connectivity as key design considerations. In response, several measures were implemented, including a shuttle service that moves users quickly and efficiently between the parking facility and the terminal, a guidance system directing drivers to available parking spaces, and a clearly defined pedestrian corridor with marked crossings.
Improving Access & Wayfinding – This project incorporates measures to enhance access, safety, and wayfinding, with particular attention to incident management, including evacuation procedures and emergency response coordination. The facility was designed in compliance with the 2010 National Building Code of Canada, as amended by Québec, and the National Fire Code of Canada. A range of strategies were implemented within and around the new parking structure to support the safe movement of vehicles, pedestrians, and cyclists. Universal design principles were applied throughout the project to enhance accessibility and safety for all users.
Resource Allocation and Natural World Credit Areas – The project achieves approximately 90% diversion of construction and demolition waste from landfill. It contributes positively to the natural world by adding over 13,000 m2 of vegetated surfaces, including a green roof planted with robust, pesticide-free vegetation and surrounding landscaping. The design includes low-flow fixtures, a drip irrigation system, and a landscape design that emphasized native plants adapted to the airport environment and requiring minimal water. These measures contribute to an 85% reduction in potable water consumption compared to an EPA baseline. From an energy perspective, the rooftop solar panels will provide a significant portion of the infrastructure’s electricity needs.
Effective Stormwater Management – The green roof includes 27% vegetated surface area and has a storage capacity of 1,000 m³, helping control flows at discharge points. Two Stormceptor hydrodynamic separators treat stormwater before it enters the municipal sewer system. Hydraulic modelling indicates that the project can manage 150% of the 95th percentile local 24-hour rainfall event.
Climate and Resilience Achievements – The anticipated 17% reduction in greenhouse gas emissions compared to the baseline case will result from optimized system design, including variable-speed compressors and fans, as well as the use of energy-efficient equipment such as LED lighting and motion detection systems. The modular concrete structure also provides an extended service life and resilience to climate-related risks. In addition, the design allows for the potential conversion to office use after the facility’s planned 20 years of parking use, extending the building’s useful life and reducing its overall carbon footprint.
Title: YUL Aéroport International Montréal-Trudeau I Stationnement P4 étagé
Location: Montréal, Québec
Envision Rating: Verified
Envision Award Date: May 26, 2026
Envision Version: v3
Project Owner: Aéroports de Montréal (ADM)
Project Sector: Transportation
Project Type: Parking Lot
Lead Envision Firm: Owner-led
Project Delivery Method: Construction Management Model for Phase 1 and Design-Bid-Build for Phase 2
Project Status: Completed in 2024